Local Environmental Services logo

Erosion & Sediment Control

Erosion & Sediment Control / BMP Installation

LES is led by a Florida Stormwater, Erosion & Sedimentation Control Inspector — FSESCI Qualified for BMP selection, installation, maintenance, field documentation, and inspection support — covering both field installation and inspection readiness on the same site without a handoff gap between separate vendors.

What’s Included

  • BMP selection, installation, and maintenance — FSESCI Qualified Inspector oversight
  • Silt fence installation
  • Inlet protection
  • Turbidity barriers
  • Wattle / fiber roll installation
  • Temporary seeding, mulching, and erosion control blanket
  • Construction and tree protective barricading
  • Street sweeping
  • Storm damage and emergency erosion repair

Installed. Maintained. Documented.

Every installation, repair, or maintenance visit is photo-documented in the field — so the work holds up under inspection, not just under a good-faith assumption.

  • Before, during, and completed-work photos
  • Field maintenance notes
  • Post-rain observations
  • Corrective action tracked through to close-out
  • Documentation-ready reports for your compliance file

Send the BMP sheet or current site conditions

Upload the erosion-control plan, site photographs, inspection deficiencies, or project address so LES can prepare an installation, repair, or maintenance scope.

Prefer to talk it through? Call 407-502-6476 and speak with the team directly.