For Developers
Erosion Control & Compliance Support for Developers
From the first day of land disturbance through Notice of Termination, a development project carries continuous erosion control and stormwater compliance exposure. LES supports that full timeline — installation, maintenance, inspection, and tree protection — so plan review findings don't turn into schedule risk.
What You're Dealing With
- Multi-phase sites where stabilization and BMP needs change as different areas reach final grade
- Tree protection and preservation requirements that need to be field-verified, not just drawn on a plan
- Inspection history gaps that slow down permit closeout and NOT filing
- Coordinating BMP work across multiple contractors and subcontractors on one site
What LES Provides
- Erosion control and stormwater BMP installation from site clearing through final stabilization
- Tree protection barricading installed and maintained through construction
- Routine and post-rain inspections with a documented, audit-ready history
- Permanent stabilization support tied to project closeout and NOT filing
- One field-capable provider instead of coordinating multiple vendors
Installed. Maintained. Documented.
Every installation, repair, or maintenance visit is photo-documented in the field — so the work holds up under inspection, not just under a good-faith assumption.
- Before, during, and completed-work photos
- Field maintenance notes
- Post-rain observations
- Corrective action tracked through to close-out
- Documentation-ready reports for your compliance file
Developers FAQ
Can LES support a project across multiple phases and years?
Yes. LES works under standing retainers for multi-phase developments, adjusting BMP scope as the site moves from clearing through grading, vertical construction, and final stabilization.
Does LES handle tree protection compliance as well as erosion control?
Yes — ISA Certified Arborist-led tree protection and field-installed barricading are handled alongside erosion control and stormwater BMP work, so tree-related permit conditions don't fall through the cracks.
Need BMP support on an active site? Talk to LES.
Tell us about your site and timeline — we'll follow up with scope and next steps.
Need erosion control, silt fence, BMP maintenance, or post-rain inspection support? Call 407-502-6476 or request a BMP proposal from Local Environmental Services.
