Riprap Installation at a Stormwater Drainage Outfall

This is a representative example illustrating the type of work LES performs, not documentation of a specific completed project. Real, photo-documented case studies will replace these examples as current work is completed.

Service Area

Central Florida stormwater outfall

Site Condition

A stormwater pipe outfall discharging into a drainage channel showed signs of scour and soil loss immediately downstream of the pipe.

The Challenge

Concentrated discharge velocity at the outfall was eroding unprotected soil, undercutting the channel bank near the pipe.

The Strategy

  • Graded riprap sized to the outfall's design discharge velocity
  • Filter fabric underlayment to prevent soil migration beneath the rock

Work Performed

Filter fabric was installed beneath the outfall and extending into the channel, with graded riprap placed over it and keyed into the channel bank to prevent flanking.

Value Created

The outfall area stabilized with no further scour observed after subsequent rain events, and the channel bank remained intact.

Risk If Ignored

Continued scour at the outfall would have undercut the channel bank further, eventually threatening the pipe structure itself and requiring a far more expensive structural repair than a properly bedded riprap apron.

Documentation Delivered

Photos of the scoured outfall before work, the filter fabric placement, and the completed graded riprap apron, with a follow-up inspection note confirming no scour after subsequent rain events.

Graded riprap stabilizing the bank of a stormwater retention pond

Need similar work done on your site?

Tell us about your project and we'll follow up with scope and next steps.

Need erosion control, silt fence, BMP maintenance, or post-rain inspection support? Call 407-502-6476 or request a BMP proposal from Local Environmental Services.